PDR Slides

pdf files for final approval / correction - 29 Oct 2013

  • 01_ISIS PI Introduction, 10/28/13
  • 02_Weidner: Agenda and Meeting Logistics, 10/28/13
  • 03_Hersman: Review Board Introduction, 10/28/13
  • 04_Weidner: ISIS Overview, 10/28/13 (PDF - 3.03MB)
  • 05_McComas: ISIS Science, 10/28/13
  • 06_Dickinson: Systems Engineering, 10/28/13
  • 07_McNutt EPI-Lo Sensor Design (Rev. 2), 10/28/13 (PDF - 6.73MB)
  • 08_Gurnee: EPI-Lo Technology Development, 10/28/13 (PDF - 2.12MB)
  • 09_Cooper: EPI-Lo Mechanical, 10/28/13 (PDF - 17.74MB)
  • 10_Gurnee: EPI-Lo Electronics, 10/28/13 (PDF - 2.02MB)
  • 11_Hayes: EPI-Lo Software, 10/28/13 (PDF - 1.20MB)
  • 12_Wiedenbeck: EPI-Hi Sensor Design, 10/28/13 (PDF - 2.57MB)
  • 13_Wiedenbeck: EPI-Hi Technology Development, 10/28/13 (PDF - 1.91MB)
  • 14_Cook/Kecman: EPI-Hi Electronics, 10/28/13 (PDF - 2.37MB)
  • 15_Davis: EPI-Hi Flight Software, 10/28/13 (PDF - 1.82MB)
  • 16_Shuman: EPI-Hi Mechanical, 10/28/13 (PDF - 2.61MB)
  • 17_Do: ISIS Power, 10/28/13 (PDF - 1.75MB)
  • 18_Gurnee: EMI / EMC, 10/28/13 (PDF - 1.29MB)
  • 19_Alexander: ISIS Structural, 10/28/13
  • 20_Dirks: ISIS Thermal, 10/28/13 (PDF - 2.04MB)
  • 21_Dickinson: Assembly, Integration and Test, 10/28/13
  • 22_Christian: Flight Operations, 10/28/13 (PDF - 1.16MB)
  • 23_Gurnee: Ground Support Equipment, 10/28/13 (PDF - 1.45MB)
  • 24_Angold: Verification, 10/28/13 (PDF - 1.33MB)
  • 25_Mitchell: EPI-Lo Calibration, 10/28/13 (PDF - 1.46MB)
  • 26_Mewaldt: EPI-Hi Calibration, 10/28/13 (PDF - 2.05MB)
  • 27_Gerhardus: Performance Assurance, 10/28/13
  • 28_Dickinson: Risk Status, 10/28/13
  • 29_Angold: Action Items, 10/28/13 (PDF - 1.14MB)
  • 30_Weidner: Instrument Development Status, 10/28/13

-- NigelAngold - 2013-10-29

Topic attachments
I Attachment History Action Size Date Who Comment
PDFpdf 04_Overview_weidner.pdf r1 manage 3034.5 K 2013-10-28 - 22:21 NigelAngold 04_Weidner: ISIS Overview, 10/28/13
PDFpdf 07_EPI-Lo_Sensor_mcnutt.pdf r1 manage 6733.4 K 2013-10-28 - 22:23 NigelAngold 07_McNutt EPI-Lo Sensor Design, 10/28/13
PDFpdf 07_EPI-Lo_Sensor_mcnutt3.pdf r1 manage 5338.0 K 2013-10-28 - 22:44 NigelAngold 07_McNutt EPI-Lo Sensor Design (Rev. 2), 10/28/13
PDFpdf 08_EPI-Lo_Tech_gurnee.pdf r1 manage 2121.1 K 2013-10-28 - 22:31 NigelAngold 08_Gurnee: EPI-Lo Technology Development, 10/28/13
PDFpdf 09_EPI-Lo_Mech_cooper.pdf r1 manage 17741.8 K 2013-10-28 - 22:25 NigelAngold 09_Cooper: EPI-Lo Mechanical, 10/28/13
PDFpdf 10_EPI-Lo_Elec_gurnee.pdf r1 manage 2018.3 K 2013-10-28 - 22:32 NigelAngold 10_Gurnee: EPI-Lo Electronics, 10/28/13
PDFpdf 11_EPI-Lo_SW_hayes.pdf r1 manage 1202.2 K 2013-10-28 - 22:33 NigelAngold 11_Hayes: EPI-Lo Software, 10/28/13
PDFpdf 12_EPI-Hi_Sensor_wiedenbeck.pdf r1 manage 2565.4 K 2013-10-28 - 22:33 NigelAngold 12_Wiedenbeck: EPI-Hi Sensor Design, 10/28/13
PDFpdf 13_EPI-Hi_Tech_wiedenbeck.pdf r1 manage 1914.7 K 2013-10-28 - 22:34 NigelAngold 13_Wiedenbeck: EPI-Hi Technology Development, 10/28/13
PDFpdf 14_EPI-Hi_Electronics_cook_bran.pdf r1 manage 2367.3 K 2013-10-28 - 22:35 NigelAngold 14_Cook/Kecman: EPI-Hi Electronics, 10/28/13
PDFpdf 15_EPI-Hi_SW_davis.pdf r1 manage 1823.4 K 2013-10-28 - 22:36 NigelAngold 15_Davis: EPI-Hi Flight Software, 10/28/13
PDFpdf 16_EPI-Hi_Mech_shuman2.pdf r1 manage 2605.2 K 2013-10-29 - 05:46 NigelAngold 16_Shuman: EPI-Hi Mechanical, 10/28/13
PDFpdf 17_Power_do.pdf r1 manage 1750.9 K 2013-10-28 - 22:37 NigelAngold 17_Do: ISIS Power, 10/28/13
PDFpdf 18_EMI_gurnee.pdf r1 manage 1288.2 K 2013-10-28 - 22:38 NigelAngold 18_Gurnee: EMI / EMC, 10/28/13
PDFpdf 20_Thermal_dirks.pdf r1 manage 2040.0 K 2013-10-29 - 14:53 NigelAngold 20_Dirks: ISIS Thermal, 10/29/13
PDFpdf 22_FlOps_christian.pdf r1 manage 1157.0 K 2013-10-28 - 22:38 NigelAngold 22_Christian: Flight Operations, 10/28/13
PDFpdf 23_GSE_gurnee.pdf r1 manage 1450.5 K 2013-10-28 - 22:55 NigelAngold 23_Gurnee: Ground Support Equipment, 10/28/13
PDFpdf 24_Verification_angold.pdf r1 manage 1331.1 K 2013-10-28 - 22:40 NigelAngold 24_Angold: Verification, 10/28/13
PDFpdf 25_EPI-Lo_Cal_mitchell.pdf r1 manage 1459.7 K 2013-10-28 - 22:41 NigelAngold 25_Mitchell: EPI-Lo Calibration, 10/28/13
PDFpdf 26_EPI-Hi_Cal_mewaldt.pdf r1 manage 2047.2 K 2013-10-28 - 22:42 NigelAngold 26_Mewaldt: EPI-Hi Calibration, 10/28/13
PDFpdf 29_AIs_angold.pdf r1 manage 1137.3 K 2013-10-29 - 14:53 NigelAngold 29_Angold: Action Items 10/29/13
Topic revision: r4 - 2013-10-29 - NigelAngold
 
This site is powered by the TWiki collaboration platform Powered by PerlCopyright © 2008-2025 by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding TWiki? Send feedback